Keine Berechtigung für die Seite Weiterleitung zur Startseite zur Eingabe von Zugangsdaten:
http://en.rsp-germany.com
Sie möchten mit uns persönlich
sprechen? Dann rufen Sie uns einfach an.
Fon + 49 3671 5721 0
zurück
weiter

Tunnel building

While the tunnel is still under construction, fine cleaning of the tunnel floor is possible with the HydroCleaner accessory. At a speed of 4 km/h, the tunnel floor is rid of concrete remains, water, sludge and loose rubble in one operation.

zurück
weiter

Tunnel building

While the tunnel is still under construction, fine cleaning of the tunnel floor is possible with the HydroCleaner accessory. At a speed of 4 km/h, the tunnel floor is rid of concrete remains, water, sludge and loose rubble in one operation.

zurück
weiter

Retrofitting of safety equipment

In many tunnels, safety equipment has to be fitted retrospectively in order to comply with statutory regulations. The cables which have been laid in the individual ducts must be exposed to enable this work to be carried out. For fire-prevention reasons, these ducts are filled with sand. The material is sucked out and transported to the storage area in a short time and without the risk of damaging the power and communications cables. On completion of the work, it can be reused.

Facebook
Contacts
Michael Hess
Area Sales Managerin Germany, Austria
Phone + 49 3671 5721 226
Fax + 49 3671 5721 220
mh@rsp-germany.com
Vania Hutter
Area Sales Manager France, East Europe, Australia, International
Phone +49 3671 5721 224
Fax +49 3671 5721 29
vh@rsp-germany.com